সকল সরকারী/বেসরকারী পরীক্ষার প্রশ্ন পেতে ক্লিক করুন গণিতের আইকিউ টেস্ট করতে ক্লিক করুন
If ‘x’ men can do a work in 8 days and ‘x + 4’ men can do it in 6 days, what is the value of ‘x’?
If ‘x’ men can do a work in 8 days and ‘x + 4’ men can do it in 6 days, what is the value of ‘x’?
- ক. 4
- খ. 6
- গ. 8
- ঘ. 12
সঠিক উত্তরঃ 12
এ সম্পর্কিত আরো প্রশ্ন দেখুন
- If 18 identical machines required 40 days to complete a job, how many fewer days would have been required to do the job if 6 additional machines of the same type had been used from the beginning?
- A time study specialist has set the production rate for each worker on a job at 22 units every therre hours. At this rate, what is the minimum number of workers that should be put on the job, if at least 90 units are to be produced per hour?
- A mechanic repairs 4 cars in 5/3 hours. How many cars can he repair in 50 minutes?
- A, B and C started a job which they can complete in 2 days. B can do the job in 5 days and C can do it in 4 days. After working for 1 day, both B and C left. How long would it take A to complete the rest of the job?
- A man and a boy together can complete a job in 81 days. Two man and three boys together can complete the job in 36 days. In how many can 4 men working together complete the job?
There are no comments yet.