After working for a total of 4 hours at temporary job we work told that we had just completed 1/4 of the task. How much longer in hour should it take us to finish the entire job?
After working for a total of 4 hours at temporary job we work told that we had just completed 1/4 of the task. How much longer in hour should it take us to finish the entire job?
- ক. 1
- খ. 16
- গ. 8
- ঘ. 12
সঠিক উত্তরঃ 16
এ সম্পর্কিত আরো প্রশ্ন দেখুন
- A machine produces 1000 units of plastic chair per hour. Working continuously at this rate how many plastic chair will this machine produce in a week?
- Mr. X can finish a work in 6 days and Mr. Y can finish the same work in 8 days. How long will it take to finish the work together?
- Some persons can do a pice of work in 12 days. Two times the number of such persons will do half of that work in:
- A man works twice as much as his assistant. The man can finish the job in 12 days. Find the number of days in which the man and his assistant can finish the job if they work together?
- A time study specialist has set the production rate for each worker on a job at 22 units every therre hours. At this rate, what is the minimum number of workers that should be put on the job, if at least 90 units are to be produced per hour?