A time study specialist has set the production rate for each worker on a job at 22 units every therre hours. At this rate, what is the minimum number of workers that should be put on the job, if at least 90 units are to be produced per hour?
A time study specialist has set the production rate for each worker on a job at 22 units every therre hours. At this rate, what is the minimum number of workers that should be put on the job, if at least 90 units are to be produced per hour?
- ক. 5
- খ. 8
- গ. 12
- ঘ. 13
সঠিক উত্তরঃ 13
এ সম্পর্কিত আরো প্রশ্ন দেখুন
- An empty pool is being filled with water at a constant rate. It takes 9 hours to fill 3/5 th of the pool. How much more time will it take to compeletely fill the pool?
- Karim and Babu can build a wooden table in 3 days. Babu can do it alone in 5 days. How many days would it take Karim to do this job alone?
- A man works twice as much as his assistant. The man can finish the job in 12 days. Find the number of days in which the man and his assistant can finish the job if they work together?
- If Salam makes a box every 5 minutes and Kalam takes 7 minutes to make a box, what will be the ratio of the number of boxees produced by Salam to the number of boxes produced by Kalam if they work for 5 hours and 50 minutes?
- A typist can type 125 pages, 36 lines each, 11 words in each line in 5 days. How many pages of 30 lines each and 12 words to each line can he type in 6 days?
There are no comments yet.