সকল সরকারী/বেসরকারী পরীক্ষার প্রশ্ন পেতে ক্লিক করুন গণিতের আইকিউ টেস্ট করতে ক্লিক করুন
A man and a boy together can complete a job in 81 days. Two man and three boys together can complete the job in 36 days. In how many can 4 men working together complete the job?
A man and a boy together can complete a job in 81 days. Two man and three boys together can complete the job in 36 days. In how many can 4 men working together complete the job?
- ক. 30
- খ. 36
- গ. 38
- ঘ. 21
সঠিক উত্তরঃ এখানে সঠিক উত্তর নেই।
এ সম্পর্কিত আরো প্রশ্ন দেখুন
- After working for a total of 4 hours at temporary job we work told that we had just completed 1/4 of the task. How much longer in hour should it take us to finish the entire job?
- Three pipes are used to fill a pool with water. Individually they can fill the pool in 9 hours, 6 hours and 3 hours. How many minutes will it take to fill the pool if three pipes are used simultaneously?
- A time study specialist has set the production rate for each worker on a job at 22 units every therre hours. At this rate, what is the minimum number of workers that should be put on the job, if at least 90 units are to be produced per hour?
- If 15 men working at the same rate can manufacture 27 baskets in an hour, how many baskets would 45 men manufacture in 40 minutes?
- A mechanic repairs 4 cars in 5/3 hours. How many cars can he repair in 50 minutes?
There are no comments yet.