সকল সরকারী/বেসরকারী পরীক্ষার প্রশ্ন পেতে ক্লিক করুন গণিতের আইকিউ টেস্ট করতে ক্লিক করুন
In a shipment of 120 machine parts, 5 percent were defective. In a shipment of 80 machine parts, 10 percent were defective. For the two shipments combined what percent of the machine parts were defective?
In a shipment of 120 machine parts, 5 percent were defective. In a shipment of 80 machine parts, 10 percent were defective. For the two shipments combined what percent of the machine parts were defective?
- ক. 6.5%
- খ. 7%
- গ. 7.5%
- ঘ. 8.0%
সঠিক উত্তরঃ 7%
এ সম্পর্কিত আরো প্রশ্ন দেখুন
- In a class of 120 students, 70 percent can speak Bengali and the rest can speak only English. If 25 percent of those in the class who can speak English can also speak Bengali, how many of the students in the class can Bengali?
- In a class of 120 students, 60 percent can speak English and the rest can speak only Bengali. If 25 percent of those in the class who can speak English can also speak Bengali, how many of the students in the class can Bengali?
- In a shipment of 120 machine parts, 5 percent were defective. In a shipment of 80 machine parts, 10 percent were defective. For the two shipments combined what percent of the machine parts were defective?
- In a production lot 40% toys are red and the remaining are green. Half of the toys are small and half are large. 10% of the toys are red and small and 30 toys are green and large. How many toys are there in total in the production lot?
- In Sajib’s collection, Bangladeshi stamp is 3 times more than the stamps of other countries. Which of the following cannot be the number of stamps in Sajib’s collection?
There are no comments yet.